Three-phase transformer with dual secondary phase for mining: 350 kVA, ready for outdoor use September 30, 2026 Read more »
The Transformer for a Demanding Environmental Zone: how We Manufactured GECOLSA’s Backup Power Solution on the Caribbean Coast August 27, 2026 Read more »
Vegetable-oil-filled distribution transformer for Ingredion Colombia: when power also cares for the planet June 17, 2026 Read more »
Custom Manufacturing: How Tesla Transformadores Built the Equipment Optimus Steel Needed May 27, 2026 Read more »
Our Funza Plant: more than 10,000 m² dedicated to speed-to-power in Colombia and Latin America March 2, 2026 Read more »